Summer 2006 Update
By admin , Saturday, September 2nd, 2006Preparations are underway at the Bartholomew yard for the drilling season in Guatemala. The new to us but used rig is being readied for shipment. A large tool box is being built to go behind the cab of the truck. It looks like a sleeper on an 18 wheeler, but it is very necessary for security. The rig is being checked from top to bottom and repaired as necessary. We are collecting tools and equipment for shipment in the container that will accompany the rig to Guatemala. (more…)






